1. Purpose
- The guide explains how to add and update Cut Off Times in the APT 2.0 system for transmission schedules.
- Default cut-off time is set to 15 minutes before departure, but supervisors can edit it.
- Ensures bag-wise cut-off timings are correctly maintained before scheduled dispatch.
2. Module Access
- Role: Sorting Divisional Operator
- Path: Sorting Module → Due Mail List → Maintain DML
3. Key Procedures
3.1 Open Due Mail List
- Enter Office ID of Despatch.
- Select schedule → click Maintain/Edit.
3.2 Add Cut Off Time
- Select Stop Office and Bag Type.
- Options: Forward Bag, Is Air, Exceptional Bag.
- Enter Closed To Office ID and Cut Off Time.
- Click Add → verify entry in table.
3.3 Update Existing Cut Off Time
- Click Edit on the row.
- Change Cut Off Time → Save.
- Verify updated value before final save.
4. Operational Guidelines
- Checks before updating: correct Stop Office, Bag Type, Closed To Office, and appropriate Cut Off Time.
Recommended actions:
- Add only required bag-wise entries.
- Update when schedules change.
- Verify all entries before saving.
5. Expected Outcome
- Accurate Due Mail List entries with correct Bag Type, Closed To Office, and Cut Off Time.
- Flexibility to update whenever operational schedules change.
6. Bag Close & Routing
- Login → Navigate to Bag Close at MO.
- Select destination office and bag type → Fetch.
- System displays schedule details (dispatch office, next office, departure/arrival times, cut-off time).
- View Routing shows multi-hop transit path.
- Incomplete hops are flagged with “Ask division to add routing.”
Updates:
Follow us on WhatsApp, Telegram Channel, Twitter and Facebook for all latest updates






إرسال تعليق