Update of IT Modernisation Project as on 31-03-2016

The latest position of implementation is as follows:
  • Primary Data Centre has started functioning at Navi Mumbai since 3rd April, 2013.
  • Disaster Recovery Centre has been powered on at Mysore on 15-05-15.
  • 28014 Departmental Post offices including mail offices and administrative offices have been networked at single Wide Area Network (WAN) and connected to Data Centre.
  • Core Banking Solution (CBS) has been rolled out in 20494 Post Offices.
  • ATMs have been installed in 759 locations.
  • Core Insurance solution (CIS-PLI) has been rolled out in 25406 Post Offices.

CSI Wave-1: Implementation of IDAM (Identity and Access Management) and SSO (Single Sign on) are under progress in Mysore Division.

Other Wave-1 security components are at Data Centre level and they are under implementation.

Anti-virus installed in 74,500 desktops 

  • Enterprise Monitoring System under CSI Wave-1 is a Data Centre level component and it is under implementation.
  • CSI wave 2 Roll out: CSI has been rolled out In Mysore Division from 01.10.2015.
  • Two HOs and Sixty three SOs were migrated to CSI in addition to NSH Mysore.
The following Legacy applications were integrated with CSI. 
  1. eMO 
  2. eMO ePayment 
  3. Register net/ Parcel net 
  4. Speed net 
  5. IPS 
  6. IFS 
  7. RMFS 
  8. NPS 
  9. UAT for Wave 2 & 3 solutions is in progress (Cycle 1 & 2 completed).
  • CSI Integration UAT III completed from 22-06-2015 to 27-06-2015 at Hyderabad.
  • Closure of defects of UAT III completed from 09th to 11th July 2015 at Hyderabad. 

Dispatch of RH Handheld devices started.

3546 devices have been dispatched to Branch Post Offices of Pilot circles.

Updates:

Follow us on WhatsApp, Telegram Channel, Twitter and Facebook for all latest updates

Post a Comment

Previous Post Next Post

Most Visited

Follow us on WhatsApp, Telegram Channel, Twitter and Facebook for all latest updates

Search Content of www.potools.blogspot.com @